Navigation Use the navigation tree to interact with the components.


Conveyor Installation

Detail on the Conveyor Installation


CV Lift (m) CV Line Length (m) Delta (Sag %) Description Starting Time (s)
5 550 3
5 10 3
5.5 60 3
18.3 298.5 2
0.5 90.5 2
95.596 751.744 3
3.5 1140 3
0 30 3
0 92.67 2
13.657 500.703 1.5
5 1000 2
5 1250 3
5.8 1561 3 M34 30
-6.703 593 3 M34 Diagonal 30
2.2 1191 3 M35 30
-3.4 385 3 MB03 30
.2 588 3 MB02 30
3.1 770 3 MB01 30
15.32324 6253.01840 3 Elders 45
12.4003 50.000 2 Radial Stacker 4



Want to contribute to this item?

If you have a bug or an idea, browse the open issues before opening a new one. You can also take a look at the Open Source Guide.



Engine Beta 0.9

Introduction

Collaborate

Would you like to list your product or become a local Shiftbulk agent?

Site Details

Sign up to get started!

Sign up its free.

Issues

List your issues with the interface.

More details

Terms | Privacy | Contact

Shiftbulk

Shiftbulk is a collaborative platform for creating detailed design calculations and purchasing schedules for belt conveyor systems

Built with Heavy-lifting and Fraternate