The table below covers a typical deliverable list for the Fire Detection and Suppression System on a bulk material handling project.
Deliverables | |
---|---|
Design, supply, Manufacturing and installation of equipment. | |
Pumps | |
Tanks | |
Pipes and Supports | |
Valves and Fittings | |
On-board instrumentation and local control panels | |
Equipment Connections | |
Zone Detectors | |
Linear Heat Cabling | |
Water storage Tank and fittings. | |
Electrical motors. | |
Spray bars with spray nozzles | |
Associated brackets and supports. | |
And any other items deemed necessary for operation. | |
Supervision and Labour for installation of equipment. | |
Commissioning |
Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01
Built with the Fraternate user framework
Please feel free to contact us if you would like to work jointly on an activity or project.