Table Search

Navigation

Use the navigation tree to interact with the database.




General Notes - Electrical

The table below covers the typical general electrical notes on a bulk material handling project.



Notes
ALL ELECTRICAL INSTALLATION SHALL COMPLY WITH THE ELECTRICAL INSTALLATION SPECIFICATION DOCUMENT NUMBER ENG-ECI-ELC-SPC-004
FABRICATOR TO SUPPLY ALL BOLTS, NUTS AND WASHERS NECESSARY FOR ASSEMBLY AND ERECTION
CABLE RACKS ARE ONLY TO BE FACTORY DRILLED, NO DRILLING IS ALLOWED ON SITE
ALL FIELD EQUIPMENT TO BE EQUIPPED WITH AN ISOLATION AND LOCKOUT POINT




ShiftBulk

Shiftbulk is a collaborative platform that simplifies the design and purchasing process for belt conveyor systems. With a comprehensive database of conveyor components, users can create custom systems and optimize costs and suppliers. Beta 0.9.01

Built with the Fraternate user framework

Collections
Tools
Documentation
Sign up to get started!

Sign up

Site Details
Issues

List of issues on ShiftBulk.

T & C's
Collaborate

Please feel free to contact us if you would like to work jointly on an activity or project.

© 2020 ShiftBulk