Use the navigation tree to interact with the database.
Quality Management System
Document Title | |
---|---|
Quality Management System Manual | |
Quality Policy | |
Control of Documents Procedure | |
Control of Records Procedure( list of records ) | |
Internal Audit Procedure | |
Control of Non-conformity products or service output | |
Nonconformity and Corrective Action procedure | |
Quality Objectives | |
Copy of an Internal management system audit report (with NCR, corrective & preventive report | |
Draft Contract Quality Plan | |
Draft Inspection and Test Plan or Quality Control Plan | |
Control of external provided processes, product and service | |
Copy of documented information for roles, responsibilities and authorities |
Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01
Built with the Fraternate user framework
Please feel free to contact us if you would like to work jointly on an activity or project.