The table below shows the suggested high level structure for the design of a work break down structure on a bulk material handling project.
Number | Description | Usage | Decimals | |
---|---|---|---|---|
1 | Component | Tag Number | 0000 | |
2 | Part | Tag Number | 0000 | |
3 | Module | Work Break Down Structure | 00 | |
4 | Unit | Work Break Down Structure | 00 | |
5 | Stream | Work Break Down Structure | 00 | |
6 | Plant/pit | Organizational Break Down Structure | 0 | |
7 | Mine | Organizational Break Down Structure | 0 |
Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01