Use the navigation tree to interact with the database.
A typical list of quality Assurance and quality control deliverables on a bulk material handling project.
Deliverables | |
---|---|
Visits to the fabricators and inspections according to approved QCP’s. | |
Generation of inspection reports | |
Generation of Non Conformance Reports | |
Recommendation of remedial procedures | |
Releasing of materials and equipment according to QCP’s | |
General feed-back to the Project Manager on quality and work progress. | |
Review and approval of QCP’s | |
Familiarisation with drawings, standards, specifications and other technical requirements. |
Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01
Built with the Fraternate user framework
Please feel free to contact us if you would like to work jointly on an activity or project.